Project Description

 

Intergrated Hipot/Functional System

Electromechanica designed and fabricated multiple test systems for a leading electrical switch manufacturer. These new systems removed a production bottleneck by reducing test cycle time. Ergonomic design reduced part handling and setup while increasing operator safety.